Saturday 11th January

A good number of volunteers braved atrocious conditions to be on site. Heavy rain and wind meant that there was a focus on inside work.

The team working in the class 26 were removing sections of corroded metalwork from around the door frame and replacing it with new material. There is still a large amount to do, but it is pulling this side of the cab back together well.

Further work was completed on the locking frame with most of the components cleaned and the frame partially reassembled. A start was also made on cleaning up the second section of the locking frame. Meanwhile John applied black top-coat to the two cover plates ready for when it goes back on the actual lever frame.

The other jobs around the site were put on hold as the weather remained miserable.


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Categories