Posted by: wrha | November 11, 2018

Saturday 10th November

A dry and cool day up the hill at Whitrope. A reasonable numbers of members were up and a number of jobs were completed.
The Ruston was use to move the steel wagon from the head-shunt line across the level crossing and into the platform. This will allow a small group that are going to start working on the wagon better access.
More work was carried out inside the brake van.
A general tidy up was carried out with a walk around all the site to check on items and ensure everything was locked away.

 

Advertisements

Responses

  1. Re Fowler. Did anybody see my emails about re-engineing the Fowler? It mentioned Pete Briddon at Darley Dale and his website ‘weekend rails? RegardsBrian

    Get Outlook for iOS


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Categories