Posted by: wrha | April 23, 2015

Track Weekend – Sunday

The Sunday was a much cooler days with showers in the morning.

Further work was done north of the crossing with more of the run-round line gauged and screwed down. With completion of the current work on the drain alongside the bay platform, the sleepers for the access track were put roughly back into position. The rails will be replaced at a later date.

At the far end of the site more ballast drops were carried out as we start to bring the track on the far side of bridge 200 up to usable condition.

Elsewhere the team were busy in the coaches and Davie had the needle gun out working on the Fowler.

Overall a very successful weekend with a number of significant jobs either completed or advanced.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Categories