Posted by: wrha | October 26, 2014

Whitrope 25th of October

A busy weekend with work done on the point rodding at Whitrope and the AGM which was held at Old Gala House in Galashiels. The two large and very heavy concrete blocks that will support the angle cranks for the point rodding were put in place. The second compensator bench was put in place and most of the rodding runs were completed. There is still a number of jobs to do but the rodding runs are very much taking shape.
The AGM was held in the very pleasant surroundings of Old Gala House and the minutes of the meeting will be available to members shortly.

The two compensator benches in position. The point rodding is coming on well.

The two compensator benches in position. The point rodding is coming on well.

The two large concrete block and joining timber in place. The cranks are currently loosely in position.

The two large concrete block and joining timber in place. The cranks are currently loosely in position.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Categories

%d bloggers like this: