Posted by: wrha | April 15, 2012

Some snippets….

Here’s a link to a very interesting piece. Its a presentation by Network Rail on plans and progress for the northern section, given to the Chartered Institute of Logistics and Transport on the 12th of April. In particular, it gives some interesting information on NR’s plans for the structures on the route, and its refreshing to see that so many of the existing bridges are to be retained and refurbished: a testament to Victorian railway engineering?

http://www.ciltscotland.com/mr120412.php

By the way, we’ve uploaded a new mystery location (apologies there hasn’t been a new one since Christmas). Take a look and give us your thoughts.

Finally, Mark 2f coach 1215 is on its way, and should rejoin an approximation of the Waverley Route at Junction 44 sometime today. Offloading at Whitrope is planned for tomorrow, fingers crossed. Photos of the move will be posted soon. Our grateful thanks go once more to all who’ve responded to the appeal for funds to move this vehicle.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Categories

%d bloggers like this: